Home/ Resources/ Container Loading Guide — 20DC, 40HQ Quantities
Resource

Container Loading Guide — 20DC, 40HQ Quantities

Plywood and veneer quantities per container by thickness, weight limits, palletization, and lead time from packing to port.

How many plywood sheets fit in a container depends on thickness, because plywood loads hit the weight limit long before it fills the volume. This guide gives indicative quantities per 20DC and 40HQ for standard 1220 × 2440 mm panels, plus how we plan each load.

Sheets per container — indicative lookup

Figures below assume standard 4 × 8 ft (1220 × 2440 mm) panels, full-pallet stacking, and a weight cap of about 25 tonnes for a 40HQ and 21 tonnes for a 20DC. Thicker panels are weight-limited; thinner panels are volume-limited. Always confirm against your final spec — film grade and moisture shift the weight slightly.

ThicknessSheets / 20DCSheets / 40HQWeight / 40HQVolume / 40HQ
3 mm~3,300~7,200~24 t~64 m³
6 mm~1,700~3,700~25 t~66 m³
9 mm~1,150~2,500~25 t~66 m³
12 mm~860~1,900~25 t~67 m³
15 mm~690~1,500~25 t~66 m³
18 mm~580~1,250~25 t~66 m³
25 mm~410~900~25 t~66 m³

A 40HQ (high-cube) carries roughly 2.1× the volume of a 20DC but the same weight headroom matters most for plywood — which is why we almost always recommend 40HQ for 12 mm and thicker: the cost per sheet landed is lower.

How we plan and pack a load

  1. Confirm spec and quantity — thickness, size, glue and grade fix the weight per sheet and therefore the achievable count.
  2. Calculate to the weight cap, not the volume — for 12 mm+ the container is full by weight with airspace left over.
  3. Bundle and strap into mill pallets sized to the door opening, with edge protectors and moisture barrier.
  4. Block and brace so nothing shifts in transit; corner posts on the top tier.
  5. Weigh and photograph the loaded container before sealing; the loading photos ship with your QC report.

Transit times from Cat Lai Port (Ho Chi Minh City)

DestinationTypical transit
India (Nhava Sheva / Chennai)7 – 10 days
Middle East (Jeddah / Dammam / Jebel Ali)14 – 21 days
EU (Rotterdam / Hamburg)25 – 30 days
US East Coast28 – 35 days

Want the exact count for your order? Send us the thickness, size and destination and we will return a loading plan with sheets per container, total weight, and the CFR/CIF figure per sheet landed.

Have a question?

Send us your inquiry — we'll respond within 24 hours, including a checklist of what we need to quote accurately.

Have a Specific Question?

Honest answers from the team that inspects our partner mills

24-hour reply. Honest answers from the team that inspects our partner mills.